Tenders :::

     <<<  Archive

                                                                                                                                                                            Back to index

     
 
 

 

September - 2012

Month wise Tenders based on Sale Open from date

Area

Tender No.

Description

Sale
Open
from

Sale
Close
on

Date
of
opening

Download

29 September, 2012
MM (HQ) Advt No. : 26/2012 -13
Dated: 19/09/12
Sl. No.096
CCL/Sr Manager(P)/CWS/
 M.S FLAT and C.S FLAT /12-13/
Supply of M.S FLAT 50X6 and C.S FLAT 75X25mm(Length 2200+ 30mm ) ,C.S.Flat 75x25mm (Length 2620+30mm)  29.09.2012 30.10.2012 (03:00 PM) 31.10.2012 (04:00 PM)  
MM (HQ) Advt. No. 26/2012-13
Dated.19/09/12
 l. No. 097CAL/0192K12
/01/42B/027/RB/RC
Supply of PVC HELICALPIPE,C.I.TAIL PIECE WITH H.D. CLAMP FOR CONCLUSION OF RATE CONTRACT FOR ONE YEAR 26.09.2012 29.10.2012 (02:30 PM)  29.10.2012 (03:30 PM)  
MM (HQ) Advt No. 27/2012-13
Sl. No. 098
CCL/SM(P)/AK//1213/
Supply of different types of Pumps-Qty42 Sets 29.09.2012 31.10.2012 (03:00 PM)  01.11.2012 (04:00 PM)  
MM (HQ) Advt No. 27/2012-13
Sl. No. 099
MM (P)/RKP/CCL/Explosive
 Van Chassis/12-13
 Supply of Chassis for Explosive Van Fabrication. 29.09.2012 31.10.2012 (03:00 PM)  01.11.2012 (04:00 PM)  
MM (HQ) Advt No. 27/2012-13
Sl. No. 100
MM(P)/RKP/CCL/Roller Inpit
Crusher Piparwar/11-12
Supply of Rollers for Inpit Crusher of Piparwar  29.09.2012 01.11.2012 (03:00 PM) 02.11.2012 (04:00 PM)  
MM (HQ) Advt No. 27/2012-13
Sl. No.101
MM(P)/RKP/CCL/PVC
Belting/Re-tender/12-13
Supply of ANTISTATIC FIRE RESISTANT PVC CONVEYOR BELTING FOR UNDERGROUND COAL MINE 29.09.2012 02.11.2012 (03:00 PM) 03.11.2012 (04:00 PM)  
MM (HQ) Advt No. 27/2012-13
Sl. No.102: MM(P)/III/
HEMM/RC/Radiators/12-13
Supply of Radiators & Oil Coolers for HEMMs  29.09.2012  03.11.2012 (03:00 PM) 05.11.2012 (04:00 PM)  
MM (HQ) CM (P-II)/KR/Wheel & axle/
 049/12-13/ 183-185
Dated: 28/09/2012
Supply of Wheels & axle. 29.09.2012 31.10.2012 (02:30 PM) 31.10.2012 (03:30 PM)  
North-Karnpura GM(NK)/E&M/Tender Notice
/12-13/3426-50
Dated: 25/09/12
Laying & Fixing 6” / 8” / 10” dia II range Pipe Line at Karkatta Coal Face & Dismantling of 6” / 8” / 10” dia Pipe Line from 19 No. Coal Stock for Installation of 1000 SPM Pump at KT Coal Face in respect of KDH Project 06.10.2012 10.10.2012 (12:00 PM) 12.10.2012 (04:30 PM)  
TA (HQ) Dy. GM(TA)/Tender/2012
-13/GNC/CC-97/5465-76
Dated:29/09/12
Misc. Repairing of masonary, water supply and sanitary work of different type qrs. At GNC, CCL, Ranchi. 01.10.2012 06.10.2012 (05:00 PM)  09.10.2012 (03:30 PM)
 
 
Civil (HQ) GM(C)/Tender/2012
-13/1303
Dated: 22/09/12.
Repairing, maintenance and renovation work of Swarnarekha Building at Darbhanga House Complex, CCL, Ranchi. 04.10.2012 26.10.2012 (01:00 PM) 30.10.2012 (03:30 PM)  
Barka-Sayal CGM/B-S/Tender/Civil
/12-13/ 5938
Dated: 28/09/12
Repair/Maint. of 2B - 2 Nos. (Sri J.P. Pandey & Md. Mujib Ansari) & 2A – 3 Nos. (Sri Jitendra Pd., Md. Hussan & Sri Shyam Jha) at River Side Bhurkunda of Bhurkunda Project. (Shifting case) 15.10.2012  17.10.2012 (05:00 PM) 18.10.2012 (04:30 PM)  
28 September, 2012

Piparwar

SO(E&M)/PPR/Vehicle
/TN/12-13/1134-45
Dated: 27/09/12
Hiring of one no. City Ride (22 Seater) per day basis for CHP-CPP, Piparwar Area 17.10.2012 20.10.2012 (05:00 PM)  30.10.2012 (04:00 PM)  

Piparwar

GM/SO(X)/PPR/ NIT
/12-13/21
Dated : 26/09/12
Repairing of 02 nos. Lincon make Float Grease Pump of Shovel P&H1900AL of Piparwar Project. Details of job as per enclosed Annexure “A”. 01.10.2012 15.10.2012 (05:00 PM) 16.10.2012 (04:00 PM)  

Kathara

GM(KTA) / SO(M) / Tender /JRD/
2012/470
Dated: 27/09/12
A.  Drilling of 2 Nos. Vertical Non coring Bore hole of 218 mtr. depth 250 mm dia for pipe from surface to dip most working of 18ft Seam for dewatering at Jarangdih UG Mine and .lowering 6” dia MS Pipe in the bore hole.

B.  Drilling of 01 No. Vertical Non-coring Bore Hole of 218 Mtrs. depth 150 mm dia from surface to dip most working of 18ft seam for dewatering at Jarangdih UG Mines.
09.11.2012 13.11.2012 (01:00 PM)
 
17.11.2012 (04:00 PM)  

CMC (HQ)

GM(CMC)/Kathara/2012/ 292
Dated : 27/09/12
Loading of coal by contractor’s Back- Hoe excavator at Jarangdih OC QBS into contractor’s tipping trucks and transportation to Jarangdih Feeder Breaker/siding for a period of three years. 05.10.2012 30.10.2012 (06:00 PM)  02.11.2012 (03:00 PM)  
27 September, 2012

B&K

CCL/B&K/ APC/Hyd. Pump/28
Dated:24/09/12
Supply of Hyd. Pump Assly for Telcon Make Hyd Shovel Ex-600 27.09.2012 27.10.2012 (05:00 PM) 29.10.2012 (04:00 PM)  

B&K

CCL/B&K/APC/Bearing/open Tender/29
Dated:24/09/12
Procurement of Bearings 27.09.2012 27.10.2012 (04:00 PM) 29.10.2012 (04:30 PM)  

Kathara

SO(MM)/KTA/HEMM/NIT/12-13/ 855
Dated:21/09/12
Procurement of HEMM Hoses
Tender is in two part.
05.10.2012 05.11.2012 (05:00 PM) 06.11.2012 (04:00 PM)  

Kuju

GM(K)/Admn/116/Sty./12-13/ 2465-70
Dated:14/09/12.
Supply of Stationary/Survey material of Kuju Area for the year ‘2012-13. 26.09.2012 30.09.2012 (04:00 PM) 01.10.2012 (04:00 PM)  
Barka-Kana CRS/SO(C)/BRK/TN/2012-13/962
Dated:24/09/12
Development & Maintenance of flower beds, lawn & Plantation of ornamental plants in the campus of Rest House, JET Hostel and Workshop at CRS, Barkakana. 28.09.2012  03.10.2012 (11:00 AM) 05.10.2012 (03:00 PM)  

Piparwar

SO(MM)/PPR/NIT/2012-13/127
Dated:26/09/12
Supply of Green horn for P&H 1900AL shovel working at Piparwar project. 27.09.2012 24.10.2012 (05:00 PM)  25.10.2012 (12:30 PM)
 
 

Piparwar

SO(MM)/PPR/NIT/2012-13/128
Dated:26 /09/12
Supply of H.T. Bolt, Nut & Washer for maintenance of CHP/CPP, Piparwar. 27.09.2012 24.10.2012 (05:00 PM) 25.10.2012 (12:30 PM)  

Piparwar

SO(MM)/PPR/NIT/2012-13/129
Dated:26/09/12
Supply of Bearings for 1035 Water Tanker (W7 & W8) working at Piparwar project. 27.09.2012  24.10.2012 (05:00 PM) 25.10.2012 (12:30 PM)  

Piparwar

SO(MM)/PPR/NIT/2012-13/130
Dated:26/09/12
Supply of Hose assy for 1035 Water Tanker (W7 & W8) working at Piparwar project. 27.09.2012 24.10.2012 (05:00 PM) 25.10.2012 (12:30 PM)  

Piparwar

SO(MM)/PPR/NIT/2012-13/131
Dated:26/09/12
supply of Rail clamp, pin and pin lock applicable to 1001 Shiftable conveyor of Inpit Crusher circuit of Piparwar project. 27.09.2012 24.10.2012 (05:00 PM) 25.10.2012 (12:30 PM)  

Piparwar

SO(MM)/PPR/NIT/2012-13/132
Dated:26/09/12
Supply of spares parts for BH35-2 dumpers working at Ashok project. 27.09.2012 24.10.2012 (05:00 PM) 25.10.2012 (12:30 PM)  

kuju

R/s Kuju/CCL/PUR/12-13/718
Dated:26/09/12.
Supply of DIFFERENT TYPE OF BEARING
 
28.09.2012 18.10.2012 (01:00 PM) 19.10.2012 (04:00 PM)  

kuju

R/s Kuju/CCL/PUR/12-13/720
Dated:26/09/12
FENCING OF DVC SWITCH YARD,POLES & CONNECTION OF JUMPERS 28.09.2012 15.10.2012 (01:00 PM) 16.10.2012 (04:00 PM)  

kuju

R/s Kuju/CCL/PUR/12-13/722
Dated:26/09/12
OF ROTATING ELEMENT COMPLETE SET (C.I) FOR 4 CHR PUMP MAKE M & P, IPBT-80 28.09.2012 18.10.2012 (01:00 PM) 19.10.2012 (04:00 PM)  

kuju

R/s Kuju/CCL/PUR/12-13/724
Dated:26/09/12.
ELECTRONIC ROAD WEIGHBRIDGE 40 MT 28.09.2012 18.10.2012 (01:00 PM) 19.10.2012 (04:00 PM)  

kuju

R/s Kuju/CCL/PUR/12-13/726
Dated:26/09/12.
DIFFERENT TYPE OF GRAPHITE PACKING 28.09.2012 15.10.2012 (01:00 PM) 16.10.2012 (04:00 PM)  

kuju

R/s Kuju/CCL/PUR/12-13/728
Dated:26/09/12
NGR SYSTEM 28.09.2012 18.10.2012 (01:00 PM) 19.10.2012 (04:00 PM)  

Rajrappa

GM(R)/Dy.GM(C)/Rajrappa
/Tender-43 (12-13)/ 43
Dated:24/09/12.
1. Day-to-day repair & maintenance work in A type under Rajrappa Washery Project

2. Repairing of Motor Cycle Stand near maintenance office at Rajrappa Washery Project

3. Day-to-day maintenance of boundary wall, Drum Yard and other patches of Regional Store under GM Unit, Rajrappa Area.
01.10.2012 06.10.2012 (12:00 PM) 08.10.2012 (04:00 PM)  

Rajrappa

GM(R)/Dy.GM(C)/Rajrappa
/Tender-44 (12-13)/ 44
Date:24/09/12
1. Repair of roof, false ceiling, valley etc of Regional Store under GM Unit, Rajrappa Area

2. Stone pitching in between loading point to fire fighting building at Rajrappa Washery Project
01.10.2012 06.10.2012 (12:00 PM) 08.10.2012 (04:00 PM)  
25 September, 2012

B&K

CCL/B&K/ EX 600 Hyd Shovel Spares/26 Dated:24/09 /12 Supply of Spares for EX 600 Telcon Make Hyd. Shovel 27.09.2012 27.10.2012 (05:00 PM) 29.10.2012 (04:00 PM)  

B&K

CCL/B&K/ SDL Spares/27
Date:24/09/12
Supply of Spares for Eimco Elecon Make SDL M/C Model 625 27.09.2012 27.10.2012 (05:00 PM) 29.10.2012 (04:00 PM)  

B&K

CCL/B&K/ APC/Spares of Roto face
pump/30
Date:24/09/12
Supply of Spares of ROTO Face Pump model RNAM 60, 10 HP ,8 LPS 27.09.2012  27.10.2012 (05:00 PM) 29.10.2012 (04:00 PM)  

North-Karnpura

GM (NK)/E&M/Tender Notice
/12-13/ 3337-62
Dated:22/09/12
Design, manufacture, supply, testing and commissioning of 3.3 KV 50A Restricted Neutral grounding system for 3 MVA 11 KV/3.3 KV Transformer consists of Non Magnetic, Stainless Steel Grid Resistance Solid State NGR Monitoring Fail Safe Relay, Solid State Earth Fault Relay, Power Pack Units, Resin Cast Neutral Current Transformer, Resin Cast HV & LV Potential Transformers, Buzzer with all necessary accessories within outdoor type Floor Mounted Panel. 04.10.2012 08.10.2012 (05:00 PM) 10.10.2012 (04:30 PM)  

North-Karnpura

GM(NK)/E&M/Tender Notice/12-13
/ 3363-92
Dated:22/09/12
Improvement in General Lighting as well as Haul Road Lighting for Proper Illumination of Mines under Purnadih Project 04.10.2012 08.10.2012 (05:00 PM) 10.10.2012 (04:30 PM)  

North-Karnpura

GM(NK)/E&M/Tender Notice
/12-13/3400-25
Dated:23/09/12
Increase / Enhance Illumination of Colony Lighting at Mohan Nagar Colony under Dakra Project. 04.10.2012 08.10.2012 (05:00 PM) 10.10.2012 (04:30 PM)  

Rajrappa

GM(R)/Dy. GM (E&M)/Wiring
/12-13/438
Dated:24/9/12
New wiring/ renovation of power distribution system for Administrative Building of Rajrappa Washery. 09.10.2012 15.10.2012 (04:00 PM) 16.10.2012 (04:00 PM)  

CMC (HQ)

GM (CMC)/Dhori/2012/291
Date:25/09/12
Loading and transportation of coal from Southern patch of quarry face of SDQ -3 Project to Kargali Washery bunker no 4(ABS Bunker) and bunker no 7(JTC Bunker) via Karipani weighbridge for a period of three years. 05.10.2012 30.10.2012 (06:00 PM) 02.11.2012 (03:00 PM)  

Hazaribagh

PO (K)/Sr. Manger (E&M)
/Hiring of Veh. /Q. Notice/12-13/198
Dated:24/09/12
1. Hiring of Diesel Ambassador Car or its Equivalent for 24 Hours/ day basis with drivers, Brand New for KOCP, Hazaribag Area, Dist. Ramgarh.

2. Hiring of Diesel Jeepcommander/Similar or its Equivalent for 24 Hours/ day basis with drivers, Brand New for KOCP, Hazaribag Area, Dist. Ramgarh.

3. Hiring of Diesel Jeep commander/Similaror its Equivalent for 24 Hours/ day basis with drivers, Brand New for Kedla O/C Project, Hazaribag Area, Dist. Ramgarh, Jharkhand
15.10.2012 25.10.2012 (05:00 PM) 27.10.2012 (04:00 PM)  
24 September, 2012

Piparwar

SO(E&M)/PPR/TN/12-13/1028-39
Dated:20/09/12
Extension of 11kv OH line between Bahera 11kv TP to Kalaynpur Transformer point and dismantling of 11kv OH line from TP behind RLS to Karo Transformer point under CHP-CPP, Piparwar Area. 27.09.2012 01.10.2012 (05:00 PM) 05.10.2012 (04:00 PM)  

Piparwar

SO(E&M)/PPR/TN/12-13/1040-51
Dated:20/09/12
Re-arrange erection of Ray-feeder 11kv, OH line Bachra feeder 11kv OH line, Vasant Vihar 11kv OH line and 3.3.kv OH line from Ray Colliery to Sangam Vihar under Bachra Project 27.09.2012 01.10.2012 (05:00 PM) 05.10.2012 (04:00 PM)  

Piparwar

SO(E&M)/PPR/TN/12-13/ 1052-62
Dated:20/09/12
Supply and laying of Hard Gravels in switching yard of 33kv Central Switching Station under GM unit, Piparwar Area. 27.09.2012 01.10.2012 (05:00 PM) 05.10.2012 (04:00 PM)  

Piparwar

SO(E&M)/PPR/TN/12-13/1063-73
Dated:20/09/12
Fresh Electrical wiring of renovated SO (Excv.) Chamber with fixing of decorative luminaries fittings and dismantling and re-fixing of AC at Suitable location under GM unit, Piparwar Area. 27.09.2012 01.10.2012 (05:00 PM) 05.10.2012 (04:00 PM)  

Piparwar

SO(E&M)/PPR/TN/12-13/1074-85
Dated:20/09/12
Painting of 293 nos. of tubular & rail pole of existing 416 / 230volt OH line used for power and lighting line And 18 nos. of static lighting tower and 5 nos. of tyre mounted lighting tower in Piparwar Mine, Piparwar Area. 27.09.2012 01.10.2012 (05:00 PM)
 
 05.10.2012 (04:00 PM)  

Piparwar

SO(E&M)/PPR/TN/12-13/1109-1120
Dated:22/09/12
Providing 550volt, 750MA, NGR in 03 nos. of Transwitches 3.3kv/550volt installed in upper section of Ray-Bachra Project, Piparwar Area 03.10.2012  05.10.2012 (05:00 PM) 10.10.2012 (04:00 PM)  

Piparwar

SO(E&M)/PPR/TN/12-13/1121-33
Dated:22/09/12
Splicing of 1600mm & 1400mm Steel Cord belting through Hot vulcanizing and Splicing of 1400mm & 1000mm PN belting through Cold process, Pulley lagging, Cold patch & Hot patch repairing in different conveyor installed at CHP-CPP, Piparwar Area. 11.10.2012 15.10.2012 (05:00 PM) 19.10.2012 (04:00 PM)  

North-Karnpura

CCL/RS/ NK / 112073/ ADV.TEN
/ 12-13 /76
Dated:22/09/12
Supply OF SPARE OF ESCORT CRANES 24.09.2012 31.10.2012 (01:00 PM) 06.11.2012 (03:30 PM)  

North-Karnpura

SO(C)/NK/Tender/2012-13/2451
Dated:10/09/12
1. Diversion of C.I. Pipe Line of Intake No. 2 from Hopper No. 3 of Monnet Washery to P.O. KDH More under GM Unit, NK Area

2. Repair & Maintenance of Teachers Colony (8 Units ‘A’ Type and 8 Units ‘B’ Type Quarters) including Drain Cleaning and Sanitary Works under GM Unit, NK Area

3. Day to Day Maintenance of Miners Qtrs of KDH Employees under KDH Project
22.09.2012 26.09.2012 (12:30 PM) 27.09.2012 (04:30 PM)  

North-Karnpura

SO(C)/NK/Tender/2012-13/2553
Dated:13/09/12
1. Repair & Maintenance of Office and Training Gallery etc. at Mines Rescue Station on Special Occasion under GM Unit, NK Area

2. CGI Roofing and Structural Steel Work in Training Gallery Portion and Barbed Wire Fencing of Compound Wall at MRS under GM Unit, NK Area
22.09.2012 26.09.2012 (12:30 PM) 27.09.2012 (04:30 PM)  

Hazaribagh

PO(T)/E&M/Hiring of Vehicle/12-13/178 Date:22/09/12 DIESEL CAR 08.10.2012 12.10.2012 (05:00 PM) 15.10.2012 (04:00 PM)  

Hazaribagh

Dy. GM(X)/TAPIN/TENDER NOTICE/TESTING /12-13/01
Dated:24/09/12
1. High Voltage Testing of AC Equipment installed in Shovel no.-554(EKG5A)

2. High Voltage Testing of DC Equipment installed in Shovel no.-554(EKG5A)

3. Testing, Setting and Replacement of Defective Relays
26.09.2012 02.10.2012 (05:00 PM) 17.10.2012 (04:00 PM)  

Barka-Sayal

CGM(BS)/AGM(BS)/NIT/2012/ 5697
Dated:21/09/12
1. Construction of 25 nos. of 1mx1m = 1 m2 brick pillar in traveling roadway of Bansgarha mine of Saunda-D Colliery.

2. White washing in underground working haulage roadway and west panel of mine no.10 of Sayal-D Colliery.
01.10.2012 10.10.2012 (05:00 PM) 11.10.2012 (12:30 PM)
 
 

Kuju

GM(K)/E&M/T-18(Hiring) 2012/ 6514
Dated:11/09/12
Hiring of School Bus 52 seats with Driver & Khalashi to cater the clock need/requirement of Ara colliery (Diesel & Lubricant etc.to be supplied by contractor for one years(304 days) 25.09.2012  28.09.2012 (05:00 PM) 29.09.2012 (03:30 PM)  

Kathara

CCL/KTA-W/GM/SO(MM) /Tender/Chain & Sprocket /2012/80
Dated:23/09/12
Procurement of Chain & Sprocket for Kathara Washery 10.10.2012 10.11.2012 (04:00 PM) 11.11.2012 (04:00 PM)  

Kathara

CCL/KTA-W/GM/SO(MM) /Tender/Oil Seal /2012/85
Dated:23.09.2012
Supply of Different sizes of Oil Seal for Kathara Washery of Kathara Area 01.10.2012 31.10.2012 (04:00 PM)  01.11.2012 (04:00 PM)  

Kathara

CCL/KTA-W/GM/SO(MM) /Tender/Pillow Bearing Block/2012/83
Dated:23/09/12
Supply of Different sizes of Pillow Bearing Block for Sawang Washery of Kathara Area 01.10.2012 31.10.2012 (04:00 PM) 01.11.2012 (04:00 PM)  

Kathara

CCL/KTA-W/GM/SO(MM) /Tender/Pump Spares /2012/77
Dated:- 23/09/12
Procurement of Pump Spares for Kathara Washery & Sawang (W) 10.10.2012 10.11.2012 (04:00 PM) 11.11.2012 (04:00 PM)  

Kathara

CCL/KTA-W/GM/SO(MM) /Tender/Screen Spares /2012/74
Dated:23/09/12
 Procurement of Different types of screen spares for Kathara Washery 12.10.2012 12.11.2012 (04:00 PM) 13.11.2012 (04:00 PM)  

MM (HQ)

Advt No. 26/2012-13 Date: 19/09/2012
Sl. No.094
CCL/HQ/MM/W/068/12-13/Crusher Segment/
Supply of Crusher Segments

 
24.09.2012 26.10.2012 (04:00 PM) 29.10.2012 (04:00 PM)  

MM (HQ)

Advt No. 26/2012-13
Sl. No.095MM(P)/III/ HEMM/RC/Cutting Edges/Retender/12-13
E-tendering with e-price bids for conclusion of Rate Contract for One year for Supply of Cutting Edges & End Bits for HEMMs 24.09.2012 29.10.2012 (04:00 PM) 30.10.2012 (04:00 PM)  
21 September, 2012

Dhori

GM(D)/Civil/NIT/2012-13-22/ 850
Dated:15-16/09/12
Patch repair of G.T.R. from Tishri Nallah to Makoli more under SDQ3 (L2.70KM) 24.09.2012 26.09.2012 (05:00 PM) 28.09.2012 (04:30 PM)  

Dhori

GM(D)/Civil/NIT/2012-13-23/ 880
Dated:18/09/12
1. R/M of Canteen building at Excavation Workshop under SDQ1 Project

2. Cleaning of drain & garbage including transportation of cleaned materials around residential qtrs.(DS)MQ- block No.60 to 76 at Central colony

3. Cleaning of drain & garbage including transportation of cleaned materials around residential qtrs.(DS) B-type 8 blocks,A-type15 blocks,C-type 35 units and D-type 4 units at Central colony
04.10.2012 06.10.2012 (05:00 PM) 08.10.2012 (04:30 PM)  

Dhori

RS/DHORI/TENDER-NOTIFICATION
/12-13/855
Dated:19/09/12
Supply of MH Lamp fittings 400/1000 W 250V 22.09.2012 13.10.2012 (05:00 PM) 16.10.2012 (04:00 PM)  

Dhori

RS/DHORI/TENDER-NOTIFICATION
/12-13/851
Dated:19/09/12
Supply of Pump Spare 22.09.2012 13.10.2012 (05:00 PM) 16.10.2012 (04:00 PM)  

Argada

GM(A)/SO(MM)/NIT/05
/HEMM./AP/12/30
Dated:20/09/12
Pneumatic Grease Gun 50Kg Capacity along with 20 Mtrs hose and gun trolly mounted (Elgi Make) 25.09.2012 03.10.2012 (05:00 PM) 05.10.2012 (04:00 PM)  

CMC (HQ)

GM(CMC)/Dhori/2012/289
Dated:20/09/12
Hiring of HEMM such as shovels, tippers, drills, dozers and water sprinklers e.t.c. 27.09.2012 17.10.2012 (06:00 PM) 20.10.2012 (03:00 PM)  

Hazaribagh

GM(H)/S.O.(C)/ Charhi
/ 2012-13/11/368
Dated:15/09/12
1. R/M of the qtr. of Smt. Shanti Devi & Others (10 Units) at Prem Nagar Colony.PEOCP.

2. Providing and laying pipeline from new bore hole near DETP pump house No. 01 to filter plant at Prem Nagar Colony of Parej (E) OCP.

3. Drain repairing & cleaning at Bank Colony & Hospital colony of JHK OCP.
20.09.2012  26.09.2012 (01:00 PM) 28.09.2012 (03:30 PM)  

TA (HQ)

Dy. GM(TA)/Tender/2012-13/GNC/CC-95/5179-91
Dated:20/09/12
Providing and laying GI pipe from new bore hole near STI to sump at GNC, CCL, Ranchi 03.10.2012 10.10.2012 (05:00 PM) 12.10.2012 (03:30 PM)  

Rajrappa

GM(R)/Dy.GM(E&M)/Hiring/12-13/429
Dated: 20/9/12
Hiring of 01 No. Diesel Jeep Bolero on hire basis for Rajrappa Area. 10.10.2012 15.10.2012 (04:00 PM)
 
16.10.2012 (04:30 PM)  
19 September, 2012

MM (HQ)

Advt No. 25/2012-13
Dated:12/09/12
Sl. No. 092
CCL/HQ/MM/W/237/10-11
/Reciprocating Feeder
Supply of Reciprocating Feeder 19.09.2012 19.10.2012 (05:00 PM) 20.10.2012 (04:00 PM)  

MM (HQ)

Advt No. 25/2012-13
Dated:12/09/2012
Sl. No. 093
CCL/HQ/MM/W/305/10-11
/Air Compressor
Supply of Air Compressor 19.09.2012 25.10.2012 (05:00 PM) 26.10.2012 (04:00 PM)  

Hazaribagh

G.M (H)/E&M/ L.Tower /KUGP
/12 /324
Dated:18/09/12
1. Errection & Commissioning of 2Nos.Lighting Tower with 2x400Watt.Metal Helide at Mine No.3 of Kedla UGP.

2. Complete repairing and renovation of Bus-bar with interlocking arrangement11KV , main-substation of KUGP
 04.10.2012 11.10.2012 (05:00 PM) 12.10.2012 (04:00 PM)  

Hazaribagh

G.M (H)/E&M/HV testing
 /KUGP/12 /325
Dated:18/09/12.
H.V.Testing and Relay Testing with CT Injector of H.T.Equipments installed at Kedla UGP. 05.10.2012 13.10.2012 (05:00 PM) 15.10.2012 (04:00 PM)  

Hazaribagh

G.M (H)/E&M/Paint& Rep /12 /326
Dated:18/09/12
1. Painting of structure, drain (Cable repairing, reconditioning and new making of RCC Slab in Central Sub.Station, Basantpur.

2. Repairing and reconditioning of 07 Nos. Remote Control of 33KV,SF-6 and MOCB of Basantpur Sub. Station under GMUnit, Hazaribagh Area.
08.10.2012 15.10.2012 (05:00 PM) 21.09.2012 (04:30 PM)  

Kathara

GM/KTA/S.O(C)(Ws)/Tender
/12-13/97
Dated:11/09/12
Renewing of steel work in R.C.B . section gantry under Sawang Washery.  04.10.2012 06.10.2012 (01:00 PM) 08.10.2012 (04:30 PM)  

Piparwar

SO(E&M)/PPR/Vehicle/
TN/12-13/991-1002
Dated:18/09/12
Hiring of 02 (Two) nos.407 Pick up Van per day basis for CISF deployed at Piparwar Area. 05.10.2012 08.10.2012 (05:00 PM) 12.10.2012 (04:00 PM)  

Piparwar

SO(E&M)/PPR/Vehicle
/TN/12-13/1003-15
Date 18.09.2012
Hiring of 02 (two) nos. Diesel Jeep (Bolero or equivalent) per day basis for Ashok project, Piparwar Area. 05.10.2012 08.10.2012 (05:00 PM) 12.10.2012 (04:00 PM)  

Piparwar

SO(E&M)/PPR/Vehicle
/TN/12-13/1016-27
Dated:18/09/12
Hiring of 01 (One) no. Diesel Jeep (Bolero or equivalent) per day basis for CISF deployed at Piparwar Area for a period of 3 (three) years 05.10.2012 08.10.2012 (05:00 PM) 12.10.2012 (04:00 PM)  

Barka-Sayal

RS (BS)/Tender Notice/2012/ 042
Dated:18/09/12
Requirement of PVC Air Ducting for Saunda-D .  20.09.2012 16.10.2012 (02:30 PM) 17.10.2012 (03:30 PM)  

Dhori

GM(D)/SO(E&M)/Tender-Notice/Diesel Jeep/12-13/903
Dated:08/09/12
01 Diesel Jeep (Bolero, Sumo or similar type) for commercial purpose for GM unit, Dhori Area 05.10.2012 09.10.2012 (05:00 PM) 10.10.2012 (04:30 PM)  

Dhori

GM(D)/SO(E&M)/Tender-Notice/Water Tanker/12-13/917
Dated:11/09/12
01 Water Tanker (12 KL capacity approx.) for SDQ-1 project 05.10.2012 09.10.2012 (05:00 PM) 10.10.2012 (04:30 PM)  

Dhori

GM(D)/SO(E&M)/Tender-Notice/Water Tanker/12-13/916
Dated:11/09/12
01 Water Tanker (12 KL capacity approx.) for SDQ-3 project 05.10.2012 09.10.2012 (05:00 PM) 10.10.2012 (04:30 PM)
 
 

Rajrappa

RP/Excv/Tender/12/ 722
Dated:18/09/12
1. Repairing of BR13-8851 Jeep(complete engine overhauling of Excavation section

2. Repairing of Fuel pump of BR13A-3844 Jeep of Excavation section

3. Repairing of 03nos Battery box of RDC-968,RDC-1041,& RDC-1046 drills

4. Repairing of blower assy,Body fan Motor and Control transformer of P&H,EKG5A,182 shovels

5. Fitment of Rear view mirrors in 10 nos 85T dumpers
01.10.2012 04.10.2012 (04:00 PM) 05.10.2012 (04:30 PM)
 
 

TA (HQ)

Dy. GM(TA)/Tender/2012-13
/DHC/5122-33
Dated:18/09/12
External washing of buildings and repairing works including painting, snowcem etc. in flower beds & cleaning jungle, surface dressing etc. at DHC,CCL,Ranchi. 21.09.2012 28.09.2012 (05:00 PM) 01.10.2012 (03:30 PM)  

Kuju

GM(K)/E&M/T-881/2012 /6515
Dated:11/09/12
Heightening of Poles of 11 KV H.T. O/H line by replacement under Pundi Project 03.10.2012 05.10.2012 (05:00 PM) 06.10.2012 (03:30 PM)  

Kuju

GM(K)/E&M/T-18./2012 /6516
Dated:11/09/12
Repairing & Reconditioning of 550 Volt ACB_01 No. and Starters 03 No. of Topa underground mines of Topa Project 27.09.2012 29.09.2012 (05:00 PM) 01.10.2012 (03:45 PM)  

Kuju

GM(K)/E&M/T-882/2012 /6517
Dated:11/09/12
PART diversion, repairing & maintenance of 11 KV O.H. Line from Ara sub-station to Sarubera sub-station under Sarubera Project. 03.10.2012 05.10.2012 (05:00 PM) 06.10.2012 (03:30 PM)  

Kuju

GM(K)/E&M/T-883/2012 /6518
Dated:11/09/12
Old rusted pole and damage conductor at Pundi colony route length 2.0 KM under Pundi Project  03.10.2012 05.10.2012 (05:00 PM) 06.10.2012 (03:45 PM)  
18 September, 2012

North-karnpura

SO(C)/NK/Tender/12-13/2078
Dated: 28/09/12
Tar-felting over roof of 13 Blocks D/S MQ (5 Blocks of Rohini Colony and 8 Blocks at Purnadih Colony) and 22 Nos. MQ (Single Storied) at Dhamdhamiya under Rohini Project 20.09.2012 25.09.2012 (12:30 PM) 28.09.2012 (04:30 PM)  

North-karnpura

SO(C)/NK/Tender/12-13/2080   
Dated: 29/08/12
Repair and Maintenance of Sr. Transit Camp (V.I.P.) under GM Unit, N.K. Area 20.09.2012 25.09.2012 (12:30 PM) 28.09.2012 (04:00 PM)  

North-karnpura

SO(C)/NK/Tender/2012-13/2381
Dated: 07/09/12 
1. Annual Maintenance Work including Providing Aluminum Windows in the Passage Jalli Openings / Windows Opening of different Wards in Regional Hospital Dakra under GM Unit, NK Area

2.  Day to Day Maintenance work in ‘B’ Type Qtrs of KDH under KDH Project
17.09.2012 20.09.2012 (12:30 PM)  21.09.2012 (04:30 PM)  

North-karnpura

SO(C)/NK/Tender/2012-13/2383
Dated: 08/09/12
1.  Repair & Maintenance of 12 Units MQ at Bhut Nagar under Dakra Project

2.  Repair & Maintenance of Project Office Building of Rohini Project

3.  RCC Wall West Side of Siding near Over Railway Bridge under KDH Project

4.  Day to Day maintenance of Sanitation Works of KDH Project
20.09.2012 24.09.2012 (12:30 PM) 25.09.2012 (04:30 PM)  

Piparwar

CGM(PPR)/SO(Civil)/PPR/Tender Notice/2012- 13/ 4751 - 65
 Dated.15/09/12
Annual maintenance of Basant vihar colony premises by collecting and disposal of tree leaves & others waste drain cleaning jungle cleaning etc under Piparwar Project. 29.09.2012 06.10.2012 (05:00 PM) 10.10.2012 (12:30 PM)  
Barka-Sayal CGM/B-S/Tender/Civil/12-13/5584
 Dated: 17/09/12
Renovation of drain in Hospital colony (From A.K.C. Hospital to Banshgarha Incline) of A.K.C. Bhurkunda under CGM Unit (BS), Sayal. 03.10.2012 06.10.2012 (05:00 PM) 10.10.2012   (04:30 PM)  

Barka-Sayal

S.O.(E&M)/B-S/Tender /Laying-C.I.Pipe /Sayal-D/12-13/5500
Dated-12/13.09.12.
Laying of 6” dia. C.I. Pipe, 400 Mtr. Length, 02nd Range, for stowing purpose at Incline No 01 & 02 of Urimari UG of Sayal-D Project. 24.09.2012 27.09.2012 (05:00 PM) 28.09.2012 (03:00 PM)  

Rajrappa

GM(R)/Sr.M(C)/ Township /Rajrappa/Tender-11 (12-13)/ 11
Dated: 14/09/12
Repair / Maintenance of LT ( 415 V ) Over Head Line as and when required to meet immediate requirement in case of power failure in the colony due to un-expected major such storm, wind, broken of insulator , poles etc. at Rajrappa Area. 21.09.2012 26.09.2012 (12:00 PM) 28.09.2012 (04:00 PM)  
15 September, 2012

Argada

SO/E&M/AA/VTen./ Explosive Van/2012-13/ 4245-71
Dated :13/09/2012
Hiring of One no. Explossive Van with valid Explosive Licence of carrying Explosive materials to work at Religara Colliery , Argada Area, CCL for carrying/ handling explosive pay load of 09.00 M.T. or more in one trip for 24 hours use at Religara Colliery. 03.10.2012  09.10.2012 (05:00 PM) 10.10.2012 (04:00 PM)  
14 September, 2012
Piparwar SO(E&M)/PPR/TN/12-13/956-66
Dated:13/09/12
1. Supply & fixing of bulkhead light fittings with CFL Lamp including electrical wiring for illumination of stair, common garage and entrance of 13 nos. ""B"" Block at CISF Colony, Piparwar Area

2. Supply & fixing of bulkhead light fittings with CFL Lamp including electrical wiring for illumination of stair, common entrance of 15 nos. MQ Block at IRB Colony, Piparwar Area

3. Repairing and maintenance of 250W HPSV light fittings for street lighting purpose and repair of electrical wiring of MQ Block No.11, Qtr. No.1 to 8 at IRB residential Colony under GM unit, Piparwar Area.

4. Repairing and maintenance of 250W, 400W HPSV / MH lamp fittings with re-fixing on the top of the pole Around central switching station under GM unit, Piparwar Area.

5. Replacement of 03 nos. of 33kv grade outdoor CT, 400/5A attached with Ashoka feeder and replacement of 03 nos.(one set) outdoor type lighting arrestor for NK feeder No.5 at Central Switching Station of Piparwar Area under GM unit, Piparwar Area.
21.09.2012 24.10.2012 (05:00 PM) 28.09.2012 (04:00 PM)  
Piparwar SO(E&M)/PPR/TN/12-13/967-78
Dated:13/09/12
Replacement of 4 nos. damaged pole of 440volt OH line along old D type quarter near DAV Piparwar to New D-1 and repair & maintenance of existing OH line of 440volt of Sur Vihar under Piparwar Project 21.09.2012 24.10.2012 (05:00 PM) 28.09.2012 (04:00 PM)  
Piparwar SO(E&M)/PPR/TN/12-13/979-90
Dated:13/09/12
Painting of 11kv OH line poles from 4211 substation to Garhi filter plant and 440volt, distribution lines pole of different rehabilitated villages like Bahera, Kalyanput, Kalyanpur coal dump, Karo, Belari, Kichto, Chiriyantand and intake well under CHP-CPP, Piparwar Area. 21.09.2012 24.10.2012 (05:00 PM) 28.09.2012 (04:00 PM)  
CRS CRS / MM / Qtn / 12-13/ 25
Dated:14/09/12.
Procurement of Consumable items for Engine Rep. Shop. 14.09.2012   10.10.2012 (10:30 AM)  
CRS CRS/BRK/Dy.GM(X)/Mfg
/12-13/103
Dated:13/09/12
Hiring of Diesel Bolero (closed) Jeep not more than five years old from the date of issue of tender. 25.09.2012 03.10.2012 (10:00 AM) 04.10.2012 (03:30 PM)  
Argada GM(A)/SO(MM)/NIT/04/Electrical Spare./AP/12/27
Dated:07/09/12
1. Neutral Grounding Resistance System (3.3Kv) : Design, Manufacture and supply of 3.3KV 50A Restricted Neutral Grounding system consists of Non Magnetic, stainless steel grip Resistance . Solid state NGR monitoring Fall safe Relay, Solid state Earth fault relay Power pack Units, Resin cast Neutral current Transformers, Resin HV & LV Instrument Transformers, Buzzer with all necessary accessories within outdoor type, floor mounted panel.

2. Neutral Grounding Resistance System (550V) : Design, Manufacture and supply of 550V. 750mA restricted Neutral grounding system consisting pf wire wound resistance, Solid state NGR Monitoring fail safe relay solid state Earth leakage relay, Resin Cast Neutral current transformer, power pack uni, Instrument transformer, Buzzer with all necessary accessories.
 01.10.2012 13.10.2012 (05:00 PM) 15.10.2012 (04:00 PM)  
Argada GM(A)/SO(MM)/NIT/04/Electrical
consumable /AP/12/28
Dated:07/09/12
DIFFERENT ELECTRICAL CONSUMABLE ITEMS FOR ARGADA AREA. 01.10.2012 13.10.2012 (05:00 PM) 15.10.2012 (04:00 PM)  
Argada GM(A)/SO(MM)/NIT/04/Electrical Spare./AP/12/29
Dated:07/09/12
1. HPSV Asymmetrical light fitting complete units control gear of rating 1x400W,230V

2. HPSV Symmetrical light fitting complete unit control gear unit of rating 1x400W,230V

3. HPSV Tubular bulb 400W
01.10.2012 13.10.2012 (05:00 PM) 15.10.2012 (04:00 PM)  
Kathara GM(KTA)/S.O(C)(Ws)/Tende
r/12-13 /90
Dated:08/09/12
1. R/M of sanitary system of qtrs. Under Kathara Washery at diff. colonies Kathara.

2. R/M of 06 nos. officers qtrs. At different colonies under Kathara Washery .

3. R/M of 15 nos. NMQ qtrs. Under Sawang Washery.

4. Renovation of basket ball ground at D.A.V School(32.00 X20.00 M) under Sawang Washery
18.09.2012 19.09.2012 (01:00 PM) 21.09.2012 (04:30 PM)  
13 September, 2012
Piparwar SO(MM)/PPR/NIT/2012-13/114
Dated:11/09/12
Supply of Fan blade assy and nut for BH60M dumper working at Ashok project. 14.09.2012 10.10.2012 (05:00 PM) 11.10.2012 (12:30 PM)  
Piparwar SO(MM)/PPR/NIT/2012-13/115
Dated:11/09/12
Supply of Snubber elastomer for P&H 1900AL Shovel working at Piparwar project. 14.09.2012 10.10.2012 (05:00 PM) 11.10.2012 (12:30 PM)  
Piparwar SO(MM)/PPR/NIT/2012-13/116
Dated:11/09/12
Supply of MCB & MCCB etc. for maintenance of machines, colonies and filter plant of Piparwar Area. 14.09.2012 08.10.2012 (05:00 PM) 09.10.2012 (12:30 PM)  
Piparwar SO(MM)/PPR/NIT/2012-13/117
Dated:12/09/12
Supply of SRM & DRM Tapes required for repair job of 6.6 & 3.3KV grade trailing cables working under Piparwar project. 14.09.2012  08.10.2012 (05:00 PM) 09.10.2012 (12:30 PM)  
Piparwar SO(MM)/PPR/NIT/2012-13/118
Dated:12/09/12
Supply of Consumables for Auto Electrical Section & Maintenance of HEMM of Piparwar project. 14.09.2012 08.10.2012 (05:00 PM) 09.10.2012 (12:30 PM)  
Piparwar SO(MM)/PPR/NIT/2012-13/119
Dated:12/09/12
Supply of spares for RT990 Groove Crane working at Piparwar project 14.09.2012 10.10.2012 (05:00 PM) 11.10.2012 (12:30 PM)  
Piparwar SO(MM)/PPR/NIT/2012-13/120
Dated:12/09/12
Supply of spares for Hydra 8Te. Crane working at Piparwar project. 14.09.2012 10.10.2012 (05:00 PM) 11.10.2012 (12:30 PM)  
Piparwar SO(MM)/PPR/NIT/2012-13/121
Dated:12/09/12
Supply of spare for WA600/ Cable Reeler working at Piparwar project. 14.09.2012 10.10.2012 (05:00 PM) 11.10.2012 (12:30 PM)  
Dhori RS/DHORI/TENDER-NOTIFICATION
/12-13/814
Dated:11/09/12
Supply of NGR SYSTEM

 
13.09.2012 06.10.2012 (05:00 PM) 09.10.2012 (04:00 PM)  
Dhori RS/DHORI/TENDER-NOTIFICATION
/12-13/823
Dated:11/09/12
Supply of
Light Fittings complete sets
13.09.2012 06.10.2012 (05:00 PM) 09.10.2012 (04:00 PM)  
Dhori RS/DHORI/TENDER-NOTIFICATION
/12-13/826
Dated:11/09/12
supply of Bearing 13.09.2012 06.10.2012 (05:00 PM)
 
09.10.2012 (04:00 PM)  
12 September, 2012
Piparwar GM(PPR)/Pers/secu.uniform/
2012/ 1348
Dated:08 /09 /12
Supply of Uniform items for non-executives and executives security personnel for the year 2012-13 of Piparwar Area. 11.09.2012 03.10.2012 (05:00 PM) 05.10.2012 (04:30 PM)  
Kathara GM(KTA)/S.O.(M)/Tender/12/
GVD/ Coal/ 468
Dated:08/09/12
Transportation of raw coal by contractor’s tipping trucks from Govindpur UG Mines, loading by chute and transfer to Sawang Washery and unloading mechanically at Sawang Washery hopper/ stockyard after weighment at Govindpur and Sawang Washery Weighbridges.
Dist-4-5 KM
Period-3(Three Years.)
24.09.2012  27.09.2012 (05:00PM) 04.10.2012 (11:30 AM)  
Barka-Sayal RS (BS)/Tender Notice/2012/ 040  
 Dated:11/09/12 .
Requirement of CFL Fittings Complete for Barka-Sayal Area. 13.09.2012 02.10.2012 (03:30 PM)  03.10.2012 (03:30 PM)  
Barka-Sayal RS (BS)/Tender Notice/
2012/ 041
Dated :11/09/12
Requirement of Cap Lamp Bulb for Barka-Sayal Area. 13.09.2012 02.10.2012 (03:30 PM) 03.10.2012 (03:30 PM)  
Barka-Sayal CGM/B-S/Tender/Civil/12-13/ 5426  
Dated: 11/09/12
Repairing of Pipe line in Hussaini Nagar M. Qtr. And type – A and type – B Qtr. Near Saunda ‘D’ Dispensary under Saunda ‘D’ Colliery. 22.09.2012 25.09.2012 (05:00 PM) 27.09.2012 (04:30 PM)  
Kuju GM(K)/Civil/NIT/12-13/ 390     
Dated:11/09/12
1. Construction of 24nos. Sectionalisation stoppings in MN Incline – VII seam at Topa UG.
2. Construction of approach road for newly constructed Project Office Building at Topa .
28.09.2012 05.10.2012 (05:00 PM) 10.10.2012 (04:00 PM)  
MM (HQ) Advt No. 24/2012-13
Sl. No.088
MM(P)/III/HEMM/RC/RECP Sps/12-13
E-tendering with e-price bids for conclusion of Rate Contract for One Year for supply of RECP Drill Spares 12.09.2012 03.11.2012 (03:00 PM) 04.11.2012 (04:00 PM)  
MM (HQ)

 

Advt No.24/2012
089 CM (Excv-Pur)/Trans Sps/50/D155(BD155)/2012-13/
For supply of transmission spares for D155/BD155 Dozer
 
12.09.2012 30.10.2012 (03:00 PM)  31.10.2012 (04:00 PM)  
MM (HQ)

 

Advt No.24 Sl. No.090
CCL/MMD/H.Q/Washrey/061/
12-13/ Crusher Roll Cylinder
Supply of Crusher Roll Cylinder for Rajrappa Washrey
 
 12.09.2012 12.10.2012 (03:00 PM)  13.10.2012 (04:00 PM)  
MM (HQ)

 

Advt. No. 24/2012-13
Sl. No. 091
CM (P) V/Tooth Point & Adaptor/
P&H 2300 XPALRShovel/RE-tender/12-13/
For supply of Tooth Point & Adaptors for P&H 2300 XPALR Shovel for Piparwar Area  12.09.2012 05.11.2012 (03:00 PM)  05.11.2012 (03:30 PM)  
MM (HQ)

 

Sr Manager(P)/RIVETS/12-13/
155-160
Dated:11/09/12
Supply of Different Sizes of RIVETS . 12.09.2012 05.10.2012 (03:00 PM) 05.10.2012 (03:30 PM)  
11 September, 2012

Dhori

GM(D)/Civil/NIT-20/12-13/ 761
 Dated :02-04/09/12
1. Repair of damaged drain around residential Qtrs. B-type(DS) 18 Nos.- Block –A-type(DS) 15 Nos. block-C-type 35 units & D-type andMaim Colony road side drain at CCD

2. Up-keeping of Chapri Rest House and Executive at Central colony

3. R/M of M.Qtrs.(DS)- block No.77&78 at Central colony

4. Providing two Nos. water tower near compound wall east & south, west & south liner of CISF-B-Coy barrack under CCD

17.09.2012

19.09.2012 (05:00 PM)

21.09.2012 (04:30 PM)

 

 Dhori

GM(D)/Civil/NIT- 21/2012-13/ 796
Dated: 09-10/09/12
1. R/M of damaged doors & windows in class room and office, providing & fixing 6 Nos. syntex water tank and other minor repair work of DAV public school,Dhori at CCD.

2. R/M of Executive Hostel, providing one No. shed, providing 6 Nos. syntax tank and other misc. work of Executive hostel at Central colony

3. Renovation of roof slabs of Store of RHD,soling of Open space adjacent to female ward and moorum spreading at flanks of approach to RHD under RHD

24.09.2012

26.09.2012 (05:00 PM) 28.09.2012 (04:30 PM)

 

 Kathara

GM(KTA)/SO(E&M)(W)/T/
Hired Vehicle/12-13/572
Dated :10.09.12

Hiring of one number Excellent working conditions diesel Bolero jeep for Sawang Washery, Kathara Area. Model not more than 05(Five) years old.

17.09.2012

21.09.2012 (01:00PM) 24.09.2012 (11:30 AM)

 

 Argada

SO(C )(A)/Tender/2012-13/
12177-212
Dated:05/09/12

1. Providing & laying D.I.Pipe line from Filter plant to Durga Mandap at Gidi’A’.

2. Replacement of damage pipe line from Quarry to Washery colony Filter plant at Gidi’C’ Colliery

3. Making 20 (Twenty) Nos of masonry Ventilation Stopping at (10 & 11 ) Incline I Seam & J seam including airway of Argada Colliery U/G.

21.09.2012

25.09.2012 (01:00PM) 27.09.2012 (04:00 PM)

 

  Rajrappa

GM(R)/Dy.GM(C)/Rajrappa/
Tender-38 (12-13)/ 38
Dated:06/09/12.

Improvement of water supply system by providing chlorination plant liquid chlorine for one year at Filter Plant at Rajrappa Project .

12.09.2012

17.09.2012 (12:00PM) 19.09.2012 (04:00 PM)

 

 CHN

CCL/CHN/Tender Notice/
2012-13/ 279
Dated: 04-05/09/12
Day to day repair and maintenance of quarters of old colony at CH Naisarai.

13.09.2012

19.09.2012 (01:00 PM) 21.09.2012 (11:30 AM)

 

CHN

CCL/CHN/Tender Notice/
2012-13/ 289
Dated: 10/09/12
Repair and maintenance of two nos. over head tank and other misc. works Near Surgical block and New Colony at CH Naisarai.

20.09.2012

26.09.2012 (01:00 PM) 28.09.2012 (11:30 AM)

 

 CHN

CCL/CHN/Tender Notice/
2012-13/ 292
Dated:11/09/12
Drain cleaning, Road sweeping, bush cutting and garbage disposal in Old Colony at CH Naisarai.

20.09.2012

26.09.2012 (01:00 PM) 28.09.2012 (11:30 AM)
 

 

 CMC (HQ)

GM(CMC)/Kathara/2012/287 
Dated:11/09/12
Loading and transportation of sand in Govindpur UG mines for a period of three years.

17.09.2012

18.10.2012 (06:00 PM) 11.10.2012 (03:00 PM)

 

10 September, 2012

Argada

SO(E&M)/AA/2012-13/
Tender-Web-7/4168-97
Dated:05/09/12
1. Complete repairing and adoption of protective devices on electrical starter (10 nos.)of different belts of Gidi-A CHP.

2. Repairing and reconditioning of the switches (3 nos.)Installed at 3 MVA, 11 KV/3.3 KV Sub-Station with Interlocking arrangement of Religara Colliery.

3. Repairing and reconditioning of (i) 200 Amps.,3.3 KV Reyroll make OCB (ii) 630 Amps.,3.3 KV Electrotekanica make VCB & (iii) 170 HP ,3.3 KV, 60 Amps. HT Starter at Gidi-A Quarry.

4. Complete repairing/rewinding of 200 KVA Transformers(FLP)3.3 KV/550V make Metropolish Victor Electric Company, Sl.no.T-1279588 of Gidi-C.

5. Repairing and reconditioning of :
(a) 3.3 KV HT Starter, Reyroll Burn make of Gidi-Washery

(b) 3.3 KV, 400 Amps. , Prabhu Make VCB sl.no. 79/2005 at Sub-Station of Gidi-Washery

18.09.2012

20.09.2012 (03:00 PM)

21.09.2012 (04:00 PM))

 

 Kathara

GM(KTA)/SO(M)/12/Tender/
GVD Sand/469
Dated:08/09/12
Rehandling / collection of coarse clean sand free from admixture of earth and other foreign materials from Jarangdih Colliery U/G mines sand stock yard including loading into Contractor’s Tipping and transporting to sand bunker of ½ incline at Govindpur UG mines.

17.09.2012

20.09.2012 (05:00 PM) 27.09.2012 (11:30 AM)

 

 Gandhi Nagar Hospital

Sr. Manager(P)/GNH/12-13/
Kitchen/Slice Bread/13
Dated:05/09/12
Rate contract for supply of white Slice Bread (400 gm packed) to Gandhinagar Hospital, Central coalfields Limited, Kanke Road, Ranchi -834008 (Jharkhand).

15.09.2012

15.10.2012 (02:00 PM) 16.10.2012 (03:30 PM)

 

  North Karanpura

GM(NK)/E&M/Tender Notice/
12-13/ 3191-3220
Dated:08/09/12
ERECETION AND DISMANTLING OF 33 KV OVER HEAD LINE OF FEEDER NO. 5 FROM PIPARWAR. SWITCHING SUB.STATION TO KD-H SUB.STATION , NK AREA.

24.09.2012

29.09.2012 (12:00 PM) 05.10.2012 (04:30 PM)

 

  Rajhara

GM(RA)/Civil/Tender/
12-13/649
Dated:07/09/12
Repair and Maintenance of 22 nos Miners Qtrs (single storied) at Churi colony under Rajhara Area

17.09.2012

25.09.2012 (01:00 PM) 27.09.2012 (11:30 AM)

 

 Piparwar

SO(MM)/PPR/NIT/2012-13/111
Dated:08/09/12.
 
Procurement of light fittings for Piparwar project.

11.09.2012

08.10.2012 (05:00 PM) 09.10.2012 (12:30 PM)

 

 Piparwar

SO(MM)/PPR/NIT/2012-13/112
Dated:08/09/12
Procurement of SF-6 Gas for 33KV Breakers of Central Switching Station under CGM Unit Piparwar.

11.09.2012

10.10.2012 (05:00 PM) 11.10.2012 (12:30 PM)

 

 Piparwar

SO(MM)/PPR/NIT/2012-13/110
Dated:08/09/12
Procurement of Light fittings etc. for maintenance of machines, Office & Central switching station of Piparwar Area.

11.09.2012

08.10.2012 (05:00 PM) 09.10.2012 (12:30 PM)

 

 Piparwar

SO(MM)/PPR/NIT/2012-13/113
Dated:08/09/12
Procurement of Bolted flat pannel for Banana screen (2731-61) under CHP/CPP, Piparwar.

11.09.2012

10.10.2012 (12:30 PM) 11.10.2012 (12:30 PM)

 

  Kuju

GM(K)/E&M/T-18(Hiring)2012/6402 Dated:22/08/12. Hiring of. ambulance van with driver cater round the clock need based requirement Ara dispencery under Ara Projcet . for period 03 years . The vechicle should not be more than 03 years old model ‘2009’. Cost of petrol price reimburance will be made by company under Ara Project.

13.09.2012

17.09.2012 (05:00 PM) 18.09.2012 (03:30 PM)

 

  Kuju

GM(K)/E&M/T-18(Hiring)2012/6493                 Dated:06/09/12 Hiring of (Ambassador Car or equivalent) with driver to cater round the clock/need based requirement for IWSP (Cost of diesel Price re_imbursement will be made by company under IWSP Project Kuju Area.

14.09.2012

17.09.2012 (05:00 PM) 18.09.2012 (03:30 PM)

 

  Kuju

RSK/CCL/TENDER/12-13/693
 Dated:07/09/12.
FOR DETONATOR BOX & EXPLOSIVE.

11.09.2012

03.10.2012 (01:00 PM) 04.10.2012 (04:00 PM)

 

  Kuju

RSK/CCL/TENDER/12-13/695
Dated:07/09/12.
ENGINE OIL CH4 15W40 FOR 60T DUMPERS

11.09.2012

03.10.2012 (01:00 PM) 04.10.2012 (04:00 PM)

 

  Kuju

RSK/CCL/TENDER/12-13/691
Dated:07/09/12.
HPSV LIGHT FITTING & SPARES..

11.09.2012

03.10.2012 (01:00 PM) 04.10.2012 (04:00 PM)

 

  Kuju

RSK/CCL/TENDER/12-13/697
Dated:08/09/12.
SPEED INDICATOR,DEPTH/DISTANCE INDICATOR OVER SPEED

11.09.2012

04.10.2012 (01:00 PM) 05.10.2012 (04:00 PM)

 

 Hazaribagh

GM(H)/S.O.(C)/ Charhi /
2012-13/09/345
Dated:06-07/09/12.
Improvement of Water supply system by providing chlorination plant at Prem Nagar water Filter Plant at PEOCP

13.09.2012

19.09.2012 (01:00 PM) 21.09.2012 (01:00 PM)

 

 Hazaribagh

GM(H)/S.O.(C)/ Charhi /
2012-13/10/ 346
Dated:07/09/12.
R/M of Jubilee Regional Hospital at KOCP.

13.09.2012

19.09.2012 (01:00 PM) 21.09.2012 (01:00 PM)

 

Barka Sayal

CGM(BS)/AGM(BS)/NIT/
2012/5343
Dated:08/09/12
1 Construction of 06 nos. isolation stoppings(East panel) 10 E.L. to 16 E.L. of M.No.10 at Sayal ‘D’ Colliery.

2 Construction of 06 nos. isolation stopping for formation of sub panel no. 01A at Hathidari seam of incline no. 1&2.

17.09.2012

27.09.2012 (01:00 PM) 28.09.2012 (12:30 PM)

 

Barka Sayal 

CGM(BS)/AGM(BS)/NIT/
2012/5327
Dated:07/09/12.
Drilling of 12 nos. 6” dia & 4” dia upward bore holes from underground working of Lower Samana to Upper Semana, Hathidari seam to Lower Semana & Bansgarha to Hathidari seam at Bhurkunda-B Colliery.

21.09.2012

05.10.2012 (01:00 PM) 06.10.2012 (11:30 AM)

 

07 September, 2012

MM (HQ)

CM(P)V/ Inpit Crusher Spares/
146/12/
Dated:05/09/12
Supply of Spares for Inpit Crusher for Piparwar Area.

07.09.2012

11.10.2012 (02:30 PM)

11.10.2012 (03:30 PM)

 

MM (HQ)

Advt No. 23/2012-13
Sl. No. 077 CM (P) V/
Dipper Bucket Assly/
P&H 2300 XPALR Shovel/
Retender/031/12-13
Supply of Dipper Assy. (Bucket) for P&H2300XPALR shovel.

07.09.2012

01.11.2012 (05:00 PM) 03.11.2012 (03:30 PM)

 

MM (HQ)

Advt No. 23/2011-12
Sl. No.080 CM (P)V /
 P&H 1900 AL Shovel/
Retender/ 151 / 12
Supply of Spares for Brake System for P&H 1900 AL Shovels 07.09.2012 29.10.2012 (03:00 PM) 30.10.2012 (04:00 PM)

 

MM (HQ)

Advt No. 23/2012-13
Sl. No. 081 CM (P) V/
BE 195B1 Shovel /
Retender/163/ 12
Supply of Auto Lubrication Spares for BE 195B1 Shovels 07.09.2012 30.10.2012 (03:00 PM) 31.10.2012 (04:00 PM)

 

North-Karnpura

SO(C)/NK/Tender/
2012-13/2079 
Dated: 28/08/12
1. Garbage Cleaning in MQ S/S Qtrs at Dhamdhamiya Colony under Purnadih Project

2. Repair and Maintenance of 32 Units M.Q. D/Storied behind R.H.D. Dakra under R.R. Shop, N.K. Area

3. Provision of Compound Wall of Transit Camp at Subash Nagar under KDH Project

4. Roof Treatment (Tarfelting) over Roof of Officers Club Dakra under GM Unit, NK Area
07.09.2012 10.09.2012 (12:30PM) 11.09.2012 (04:30 PM)

 

Barka-Sayal

CGM(BS)/Survey-Item/
12-13/ 5153     
Dated: 04/09/12
Supply of various survey items required for Barka-Sayal Area for the year 2012-13 as per the enclosed list. 24.09.2012 25.09.2012 (05:00 PM) 26.09.2012 (12:30 PM)  

Argada

GM(A)/SO(MM)/NIT/04/
Electrical Spare./AP/12/25               
Dated:03/08/12
Illuminaries/ Lighting spares (HPSV Choke & Fittings) 10.09.2012 22.09.2012 (05:00 PM) 25.09.2012 (04:00 PM)  
Argada GM(A)/SO(MM)/NIT/109/
Bearing./AP/12/26
Dated:03/08/12
Bearing -22236/RW33FY 10.09.2012 22.09.2012 (05:00 PM) 25.09.2012 (04:00 PM)  
06 September, 2012

Piparwar

SO(MM)/PPR/NIT/201213/96
Dated : 27/08/2012
Supply of Skirt Board sealing system, type spillex for conveyor 1023 under CHP/CPP, Piparwar

07.09.2012

26.09.2012 (05:00 PM)

27.09.2012 (12:30 PM)

 

Piparwar

SO(MM)/PPR/NIT/201213/97
Dated:27/08/12
Supply of mounting Brace applicable to 1001 shiftable conveyor of Inpit Crusher circuit of Piparwar project.

07.09.2012

26.09.2012 (05:00 PM)

27.09.2012 (12:30 PM)

 

Piparwar

SO(MM)/PPR/NIT/201213/98
Dated:30/08/12
Supply of spares required for 45KW LCS and Gear Box under CHP/CPP, Piparwar Area.

07.09.2012

27.09.2012 (05:00 PM)

28.09.2012 (12:30 PM)

 

Piparwar

SO(MM)/PPR/NIT/201213/100
Dated:30/08/12
Supply of Computers with Peripherals for use of CISF at Piparwar Area.

07.09.2012

27.09.2012 (05:00 PM)

28.09.2012 (12:30 PM)

 

Piparwar

SO(MM)/PPR/NIT/201213/101
Dated:31/08/12
Supply of Bearings for CAT 777D Dumpers working at Piparwar project.

07.09.2012

27.09.2012 (05:00 PM)

28.09.2012 (12:30 PM)

 

Piparwar

 

SO(MM)/PPR/NIT/201213/102
Dated:31/08/2012
Supply of Hose assy for CAT 777D Dumpers working at Piparwar project.

07.09.2012

27.09.2012 (05:00 PM)

28.09.2012 (12:30 PM)

 

Piparwar

 

SO(MM)/PPR/NIT/201213/103
Dated: 01/09/12
Supply of Thyristor for P&H 2300 Shovel working at Piparwar project.

07.09.2012

02.10.2012 (05:00 PM)

03.10.2012 (12:30 PM)

 

Piparwar

 

SO(MM)/PPR/NIT/201213/104
Dated:01/09/12
For supply of Carbon brush for P&H 1900AL Shovel working at Piparwar project.

07.09.2012

02.10.2012 (05:00 PM)

03.10.2012 (12:30 PM)

 

Piparwar

 

SO(MM)/PPR/NIT/201213/105
Dated:01/09/2012
Supply of Lubricants for HEMM working at Piparwar Area.

07.09.2012

24.09.2012 (5:00 PM)

25.09.2012 (12:30 PM)

 

Piparwar

 

SO(MM)/PPR/NIT/201213/106
Dated:05/09/12
Supply of CSR items for Piparwar area.

07.09.2012

03.10.2012 (05:00 PM)

04.10.2012 (12:30 PM)
 

 

Piparwar

 

SO(MM)/PPR/NIT/201213/107
Dated:05/09/12
Supply of D.G.M.S. approved fire resistant hydraulic fluid type-HFDU-68 for Ray-Bachra U/G Mine.

07.09.2012

03.10.2012 (05:00 PM)

04.10.2012 (12:30 PM)

 

Piparwar

 

CGM(PPR)/SO(Civil)/PPR/
Tender Notice/2012-13/447185                                
Dated:31/08/12
Door to door collection of domestic waste/ debries on day to day basis and cleaning of premises of quarters by picking of polythene bags and other waste including disposal of above waste outside the colony at Basant Vihar colony under Piparwar Project 17.09.2012

22.09.2012 (05:00 PM)

24.09.2012 (12:30 PM)

 

Piparwar

 

CGM(PPR)/SO(c)/PPR/
Tender Notice/2012-13/
4528-42
Dated:31/08/12
1. Repair & maintenance of 11 (eleven) units ‘A’ type (s/s) Dhamdhamia under Ahok project.

2. Dumper shed RCC flooring repair & some small work at workshop complex under Ashok project.
11.09.2012

17.09.2012 (05:00 PM)

19.09.2012 (12:30 PM)

 

Piparwar

 

SO(E&M)/PPR/Vehicle/TN/
12-13/934-46
Dated:05/09/12
Hiring of 01 (One) no. Diesel Jeep (Bolero or equivalent) per day basis for Piparwar Project, Piparwar Area.

19.09.2012

22.09.2012 (05:00 PM)

25.09.2012 (04:00 PM)
 

 

Hazaribagh

 

G.M (H)/E&M/ earth cutting
/12/301  
Dated: 04/9/12
01. Lying of gravels, sand &earth cutting of main Sub-Station 2x3MVA of Kedla OCP.

02. Installation of C.T., errection of Isolators including earthling at other equipments installed at Central Sub.Station,Basantpur.

25.09.2012

03.10.2012 (05:00 PM)

04.10.2012 (04:00 PM)

 

Hazaribagh

 

G.M (H).(H)/E&M/ HV Test/12 / 293    
Dated:29/8/12.
HV Test of Switch Gear and transformers and calibration of relays of switch gears installed at Tapin OCP Substation

22.09.2012

29.09.2012 (05:00 PM)

01.10.2012 (04:00 PM)

 

Hazaribagh

 

G.M (H).(H)/E&M/ errection of tower
/12/ 294              
Dated:29 /8/12.
1. Errection & Commissioning of 1 (one) no lighting tower with light fitting at east side area of Vth seam near Kedla Chowk of 4 TB quarry of Kedla OCP

2. Errection & testing of potential transformer ,isolaters including fabrication of structure in 33KV substation at basantpur

24.09.2012

01.10.2012 (05:00 PM)

03.10.2012 (04:00 PM)

 

Rajhara

 

SO(MM)/RA/NIT/201213/2                 
Dated:05/09/12.
Supply of Hose assy for L&T CKD Shovel and BD-155 Dozer working at Tetariakhar OCP, Rajhara Area

07.09.2012

03.10.2012 (04:00PM)

04.10.2012 (12:30 PM)

 

Kuju

 

GM(K)/Admn/116/Brief cash/
12-13/2300-2302                  
Dated:01/09/12
Supply of Brief Case of reputed Company like VIP etc. Brief case of size 45x37x13”

14.09.2012

17.09.2012 (04:00 PM)

18.09.2012 (04:00 PM)

 

Rajrappa

 

GM(R)/Dy.GM(C)/Rajrappa/
Tender-36 (12-13)/ 36                     
Dated:05/09/12
1 Making PCC road near new magazine (OB Dump ) for Sec.II Mine ( 100 M.) at Rajrappa Project.

12.09.2012

17.09.2012 (12:00 PM)

19.09.2012 (04:00 PM)

 

CMC (HQ)

 

GM(CMC)/Rajrappa/2012/285                      Dated:05/09/12 Loading of coal by contractor’s pay loader into tippers at Rajrappa Washery stock yard near raw coal receiving hopper and transportation of the same to receiving Hopper after weighment at Rajrappa Washery road weighbridge for a period of one year.

12.09.2012

03.10.2012 (06:00 PM)
 

   

CMC (HQ)

 

GM(CMC)/Dhori/2012/284                            Dated:05/09/12 Transportation of coal from SDQ I QBS to CHP (Ground Bunker)/Surface stock loading by Departmental Manual Labour of SDQ I Project of Dhori Area for a period of three years.

12.09.2012

03.10.2012 (06:00 PM)

   

CMC (HQ)

 

GM(CMC)/Argada/2012/286
Dated:05/09/12
Loading & Transportation of coal from Surface Stock (Heap No. 2 & 7 ) of Giddi-A OCP to Feeder Crusher/ Railway Siding Saunda, Barka- Sayal Area for a period of two years.

12.09.2012

03.10.2012 (06:00 PM)

   

North-Karnpura

 

GM(NK)/E&M/Tender Notice/
12-13/ 3125-54               
Dated:04/09/12
Diversion of 11 KV OH Line (KT Feeder) from Jehlitand to Old 32 Qtrs for development of Mines under KDH Project.

15.09.2012

19.09.2012 (12:00 PM)

21.09.2012 (04:30 PM)

 
05 September, 2012

MM (HQ)

Advt No. 23/2012-13
Sl. No.078CM(P) V /
P&H 2300 XPALR Shovel /
Retender/ 156 / 11
Supply of Spare Parts Suitable for P&H 2300 XPALR Shovels. 05.09.2012 17.10.2012 (04:00 PM) 18.10.2012 (03:30 PM)  

MM (HQ)

Advt No. 23/2011-12
Sl. No.079 CM (P)V /
P&H 1900 AL Shovel /
Retender/ 155-213 / 11
Supply of Spares for Auto Lubricating System for P&H 1900 AL Shovels
 
05.09.2012 18.10.2012 (04:00 PM) 19.10.2012 (03:30 PM)  

MM (HQ)

Advt No.23/2012-13
Sl. No.082 Sr.Mgr(P)/SKA /
88,107/10-11/Worm Type Gear Box
Supply of Worm Type Gear Box 05.09.2012 01.10.2012 (04:00 PM) 03.10.2012 (03:30 PM)  

MM (HQ)

Advt No.23/2012-13
Sl. No. 083 CCL/MM/HQ /W/
238/11-12/Tramp Magnet
Supply of TRAMP MAGNET


 

 05.09.2012

03.10.2012 (05:00 PM)  04.10.2012 (03:30 PM)  

MM (HQ)

Advt. No. 23/2012-13
Sl. No. 084 MM(P)/RKP/CCL/
Sps-PLS450 Pump/12-13
Supply of PLS-450 Pump Spares. 05.09.2012 04.10.2012 (04:00 PM) 05.10.2012 (03:30 PM)  

MM (HQ)

Advt No. 23/2012-13
Sl. No. 085 MM(P)/RKP/CCL/ Gay Pump Spares/12-13
Supply of Gay Pumps Spares. 05.09.2012 05.10.2012 (04:00 PM) 06.10.2012 (04:00 PM)  

MM (HQ)

Advt No. 23 Tender Sl. No.086CCL/
MMD/H.Q/Washrey/059/12-13/
Cyclone for Kathara Washrey
Supply of Cyclone for Kathara Washrey 05.09.2012 06.10.2012 (04:00 PM) 07.10.2012 (04:00 PM)  

MM (HQ)

Advt No. 23/2012-13
Sl. No 087MM(P)/RKP /CCL/
CHP Belting/13-14
Supply of FRAS Grade Rubber Belting of different sizes for CHP’s of CCL
 
05.09.2012 08.10.2012 (04:00 PM)  09.10.2012 (04:00 PM)  

MM (HQ)

MM(P)/RKP/CCL/Air Compressor-EKG5A/192A-203/12-13/
Dated:16/08/12
Supply of Vacuum Contactor Unit for HEC EKG-5A Shovel 05.09.2012 10.09.2012 (02:30 PM) 10.09.2012 (03:30 PM)  

Dhori

GM(D)/Civil/NIT-19/2012-13/ 725
Dated:29-30/08/12
1. Widening of diversion of Jhuria Nallah(L-180M) at Dhako Basti under Dhori(E) Project.

02. Dismantling of unauthorized pipe connection of main water supply CI pipe line 250mm dia and covering GI main pipe by PCC near Sharda colony under CCD
20.09.2012 22.10.2012 (05:00 PM) 24.09.2012 (04:30 PM)  

Dhori

GM(D)/Civil/NIT/2012-13-18/ 705
Dated:24-28/08/12
1. Repair of colony road near M.Qtrs.(DS)- block No,31&32 and block No.72,73&75 atCentral colony.

2. Repair of colony road & side drain near Makoli More and repair of road near C-type qtrs.(DS)-qtr. No.51 to 63 at Central colony.
06.09.2012 08.09.2012 (05:00 PM) 05.09.2012 (12:05PM)  

Kathara

GM(KTA)/SO(E&M)(W)
/Tender/SGW/12-13/534
Dated:03/09/12
Excavation of compact coal, slurry and muddy soil cutting & cleaning in different location in the premises of Sawang Washery during monsoon preparation. 05.09.2012 11.09.2012 (05:00 PM) 13.09.2012 (11:30 AM)  

B&K

DCME/E&M/Re-Tender/12-13/539
Dated:01/09/12
Laying of 8” dia delivery pipe line for a route length of 474 mtr, for operation of 2000 GPM Kriloshkar make pump of Kargali (OC) . 18.09.2012 19.09.2012 (04:00 PM) 21.09.2012 (04:30 PM)  

Kuju

GM(K)/E&M/T-18./2012/ 6448
Dated:28/08/12
1. For the work “Repairing & reconditioning of ACB 100A, 440V_03 Nos., Starter 550 V, 50HP_01 and Lighting Transformer 550V/110 V, 5KVA of MN_incline of Topa UG of Topa Project.

2. For the work Repairing of 3.3KV/415VOLT, 315KVA, S.L. No. 66381 installed at Miner’s colony (Make winpower mode) under Topa Project of Kuju Area.

3. For the work complete repairing and reconditioning of 04 Nos. (Four) L.T. STARTORS OF PUNDI PROJECT (FACE PUMP)
15.09.2012 19.09.2012 (05:00 PM) 21.09.2012 (03:30 PM)  

Kuju

GM(K)/E&M/T-18(Hiring)2012/6404 Dated:22/08/12 Hiring of (Bolero, Tata Sumo & Marshal Jeep) with driver to cater round the clock/need based requirement for Pindra Colliery (Cost of diesel Price re_imbursement will be made by company under Pindra Project. 13.09.2012 17.09.2012 (05:00 PM) 18.09.2012 (03:30 PM)  

Kuju

GM(K)/E&M/T-859/2012/6430
Dated:25/08/12
For renovation and up gradation/Capacity enhancement of our 40MT electronic road weigh bridge to 50MT electronic road weigh bridge of Karma Project 15.09.2012 19.09.2012 (05:00 PM) 20.09.2012 (03:30 PM)  

Kuju

GM(K)/E&M/T-18(Hiring Water Tanker/2012/6403 Dated:22/08/12 Hiring Water Tanker with Driver to cater round the clock need/based requirement of Pundi Project (cost of diesel price Re_imbursment will be made by company for 01(one) years under Pundi Project. 13.09.2012 17.09.2012 (05:00 PM) 18.09.2012 (03:30 PM)  

Rajrappa

GM(R)/Dy.GM(C)/Rajrappa
/Tender-35 (12-13)/ 35
Dated:04/09/12
Repair & Maintenance work in M.Q ( 20 Units ) under Rajrappa Washery Project. 12.09.2012 17.09.2012 (12:00 PM) 19.09.2012 (04:00 PM)  

Rajrappa

GM(R)/Dy.GM (E&M)/ Rep/12-13/386
Dated:04/09/12
Self repairing and running work
of Tata Truck No. BR-13H/1138
of Rajrappa Project.
14.09.2012 19.09.2012 (05:00 PM) 20.09.2012 (04:00 PM)  

Barka-Sayal

CGM/B-S/Tender/Civil/12-13/5126
Dated:03/09/12
Strengthening / Renovation of Coal Transportation Road (C.T.R.) from Regional Store to Feeder Breaker at Saunda under CGM Unit (B-S), Sayal. 17.09.2012 19.09.2012 (05:00 PM) 20.09.2012 (04:30 PM)  

Barka-Sayal

CGM/BS/Tender/Civil/12-13/5090
Dated:01/09/12
Widening of (CTR) Road near Bhanu colony from Mine No. – 8 Sayal to turning point near Damodar Bridge Urimari under CGM Unit (B-S), Sayal. 15.09.2012 18.09.2012 (05:00 PM) 19.09.2012 (04:30 PM)  

TA (HQ)

Dy.GM(TA)/Tender/2012-13/
GNC/4643-55
Dated:03/09/12
Development of park and Repair/Maintenance of Durga Mandap in Club at GNC,CCL,Ranchi. 06.09.2012 12.09.2012 (01:00 PM) 14.09.2012 (03:30 PM)  

CMC (HQ)

GM(CMC)/CCL/Tender/ e-Tendering/ 2012/283
Dated:05/09/12
Appointment of Service Provider for electronic tendering as per scope of the work detailed in the NIT document for Civil department of CCL,Ranchi. 10.09.2012 25.09.2012 (03:00 PM) 09.10.2012 (03:15 PM)  
04 September, 2012

Kathara

SO(MM)/KTA/Audio Visual Alarm/NIT
/12-13/842
Dated:01/09/12
Supply of Audio Visual Alarm for Dozer and Dumper in favour of Kathara Colliery of Kathara Area.
 
04.09.2012 03.10.2012 (04:00 PM) 04.10.2012 (04:00 PM)  

North-Karnpura

CCL/RS/ NK / 222056/ADV.TEN/
12-13 /68
 Dated: 01/09/12
SPARE PARTS FOR ELECON FEEDER BRAKER
 
01.09.2012 11.10.2012 (01:00 PM)  12.10.2012 (03:30 PM)
 
 

North-Karnpura

RS/NK/DAKRA/ ADV.TEN/
LTE/12-13/69
Dated:01/09/12
BEARING OF PUMP 04.09.2012 11.10.2012 (01:00 PM) 12.10.2012 (03:30 PM)
 
 

Hazaribagh

PO (K)/Sr. Manger (E&M)/
Hiring of Veh. /Q. Notice/12-13/176
Dated:31/08/12
Hiring of 03 (Three) Nos. Diesel Jeep (Closed body) Bolero or its Equivalent for 24 Hours/ day basis with drivers, Brand New for Kedla O/C Project, Hazaribag Area, Dist. Ramgarh, Jharkhand. 31.08.2012 30.09.2012 (05:00 PM) 02.10.2012 (04:00 PM)  
03 September, 2012

Rajrappa

Dy.GM (MM)/PUR/ ENQUIRY/12-13/45 Dated:31/08/12 Supply of Spares for P&H 1900AL Shovel. 03.09.2012 24.09.2012 (01:00 PM) 24.09.2012 (01:30 PM)  

Rajrappa

Dy.GM(MM)/PUR/ENQUIRY /12-13/46
Dated:31/08/12
Supply of Spares for P&H 1900AL Shovel. 03.09.2012 24.09.2012 (01:00 PM) 24.09.2012 (01:30 PM)  

Rajrappa

Dy.GM (MM)/PUR/ ENQUIRY/12-13/47
Dated 31/08/12
Supply of Lighting Spares for Rajrappa Area. 03.09.2012 24.09.2012 (01:00 PM) 24.09.2012 (01:30 PM)  

Dhori

RS/DHORI/TENDER-NOTIFICATION
/12-13/720
Dated:01/09/12
Supply of Rope Clip with handle for U/G Mines in Public sectors 04.09.2012  22.09.2012 (05:00 PM) 24.09.2012 (04:00 PM)  

Dhori

RS/DHORI/TENDER-NOTIFICATION/
12-13/721
Dated:01/09/12
Supply of Carbon Brush & Holders for EKG 4.6 Shovel in Public sectors 04.09.2012 22.09.2012 (05:00 PM) 24.09.2012 (04:00 PM)  

Dhori

RS/DHORI/TENDER-NOTIFICATION/
12-13/722
Dated:01/09/12
Supply of ICDP & ICTP Switches in Public sectors 04.09.2012 22.09.2012 (05:00 PM) 24.09.2012 (04:00 PM)  

North-Karnpura

GM (NK)/E&M/Tender Notice/
(Hiring of Jeeps.)/12-13/ 3013-42
Dated:31/08/12
Diesel Jeep (Closed Body) like Bolero/Tata Sumo/Sumo Victa etc. 13.09.2012 19.09.2012 (12:00 PM) 21.09.2012 (04:30 PM)  

CMC (HQ)

GM(CMC)/Dhori/2012/282
Dated:03/09/12
Loading and transportation of ”F’ grade coal from Amlo surface stock(Heap no 9) to Kargali Washery Bunker 4(ABS Bunker) and (JTC Bunker) for a period of three years. 10.09.2012 01.10.2012 (12:00 PM)
 
 05.10.2012 (03:00 PM)  
01 September, 2012

North Karanpura

SO(C)/NK/Tender/2012-13/1991
Dated:24/08/12
1. Day to Day Maintenance work in ‘A’ Type Qtrs of KDH under KDH Project.

2. Cleaning / Repair of Septic Tanks & Chambers of Residential / Non-residential Buildings at Dakra under GM Unit, NK Area.

3. Repairing of Unit Store Approach Road from Main Road to Unit Store under KDH Project.

4. Making 02 Nos Crossing in different levels in Panel W5 in Lower Bachra Seam at CRO Mine No. 6/7 incline under Churi Project.
03.09.2012 06.09.2012
(12:30 PM)
07.09.2012
(04:30 PM)
 

Barka-Sayal

R/S(BS)/Tender Notice/2012/038
Dated:31/08/12
Quotations are invited for supply of materials indicated in the attached schedule. 01.09.2012 25.09.2012 (02:30 PM) 26.09.2012
(03:30 PM)
 

Barka-Sayal

R/S(BS)/Tender Notice/2012/037 Dated:31/08/12. Quotations are invited for supply of materials indicated in the attached schedule. 01.09.2012 25.09.2012 (02:30 PM) 26.09.2012 (03:30 PM)  

Barka-Sayal

CGM(BS)/Tender/Civil/12-13/5017 Dated:31/08/12 Supplying and Distribution drinking water in Tillaya, Aswa Tola and other villages as when required through Urimari Project. 11.09.2012 13.09.2012 (05:00 PM) 14.09.2012
(04:30 PM)

 

Barka-Sayal

CGM(B-S)/Tender/Civil/12-13/ 5019 Dated:31/08/12. Repair & Maint. of Executive Hostel at Urimari Project. 11.09.2012 13.09.2012 (05:00 PM) 14.09.2012 (04:30 PM)  

Barka-Sayal

CGM(BS)/Tender/Civil/12-13/5015 Dated:31/08/12. Diversion / Renovation of Road from P.O. Office Central Saunda towards Saunda ‘D’ via back side of P.O. Office due to Subsidence under CGM Unit (B-S), Sayal. 11.09.2012 13.09.2012 (05:00 PM) 14.09.2012 (04:30 PM)  

Kathara

GM(KTA)/C-2/Tender/Hiring of light vehicle
/12-13/1666
Dated:24/08/12.
1. Hiring of 01(one) no. Bolero/ Diesel Jeep against surveyed off Jeep No.: BRY-1409 upto 30.03.2015 for GM Unit, Kathara Area. (Including Diesel).

2. Hiring of 01(one) no. Bolero/ Diesel Jeep against surveyed off Jeep No.: BRY-4718 upto 31.03.2015 for GM Unit, Kathara Area. (Including Diesel).

3. Hiring of 01(one) no. Bolero/ Diesel Jeep for Manager (Mining)/SOM of Govindpur Ph-II OCP upto 31.03.2015 for GM Unit, Kathara Area. (Including Diesel).

4. Hiring of 01(one) no. Ambassador Car (Diesel) against surveyed off vehicle no.WBG-9908 for AAO (KTA), Kathara. (Including Diesel).

5. Hiring of 01(one) no. Bolero/Marshal/Commander (Diesel) for Security Section for patrolling purpose and other allied works for Sawang Colliery upto 31.03.2015. (Including Diesel)." 
10.09.2012 13.09.2012
 (05:00 PM)
14.09.2012 (04:00 PM)